There also isn't enough space at the end of the rows. The project architect estimates that the library needs an additional 30% of stack space to correctly space the shelves.
The access problem doesn't end in the stacks. Chairs, tables and computer stations are squeezed together, and as in the town hall, there is no handicapped accessible bathroom.
